Reg: Cooling process.
10-06-2015, 05:48 AM,
#1
Reg: Cooling process.
Hi Friends,

Is there any way to reduce the cooling time of the job in the thermal spray passes maintaining the inter pass temperature.

Right now am using pressurized air for cooling the job.

Is there any better way than this.

Thanks in advance.
Reply
10-12-2015, 11:05 AM,
#2
RE: Reg: Cooling process.
Hi Dilep
In order to have a better spray coating cooling, you can use criogenic nitrogen gas air jets, if you need some more notices, see www.airproducts.com
Best regards
Luigi
Reply
10-16-2015, 01:05 AM, (This post was last modified: 10-16-2015, 01:21 AM by Johnny_Blaze.)
#3
RE: Reg: Cooling process.
(10-06-2015, 05:48 AM)Dileep Wrote: Hi Friends,

Is there any way to reduce the cooling time of the job in the thermal spray passes maintaining the inter pass temperature.

Right now am using pressurized air for cooling the job.

Is there any better way than this.

Thanks in advance.


Hi Dileep,

There's a few things to consider,

*Process type.

*Substrate material.

*Component size, and mass.

*Linear speed (sfpm or m/min)

*Step size (mm or inches/rotation.

*Material type (powder type used).

*Spray distance.

*Feed Rate.

*Deposition rate (thickness per pass/cycle).

*Type of cooling jets and or tubes.

Controlling the application temperature is the first thing to look at before considering additional expenses to other cooling techniques. If that doesn't give you the results, then by all means go for something more radical.

Typically, the three main factors; linear speed, step size (traverse rate) and feed rate, ultimately determine deposition rate per cycle, pass or scan due to the feed rate being a relatively fixed constant.

Even at a close spray distance if you adjust the previous three to control deposition rate, you can minimize the maximum temperature of the application combined with cooling jets and vortex tubes.

Regards,
John
Reply




Possibly Related Threads…
Thread Author Replies Views Last Post
  Nitrogen Cooling Neufeld 2 2,490 08-20-2019, 11:40 AM
Last Post: loriolo
  Part shrinkage after cooling down. Rage2371 5 3,740 06-14-2018, 09:42 PM
Last Post: KevGarty
  hvof cooling kschewe 0 3,438 07-16-2012, 06:10 AM
Last Post: kschewe
  Process Gasses Purity Impact towards Plasma Spray Process, equipment or outcome Alexangel1226 8 12,283 06-12-2012, 02:46 PM
Last Post: Eric Tolliver
  3MB gun air cooling Azraf Saip 1 4,004 10-21-2011, 09:15 PM
Last Post: LEN WOOD
  Advantages of forced cooling of components during Plasma Spray Process -- Reg sreenuvundela 1 5,462 09-19-2011, 05:40 PM
Last Post: Gordon
  Masking of Cooling Holes gshejale 4 8,234 01-20-2008, 10:09 PM
Last Post: plasmajet1990