Posted by Samuel Akiode on February 21, 2004 at 17:35:36:
I want to know the minimum setback between a property and 33Kv overhead conductor. Is it appropriate to extend 33KV overhead line into an Estate or to erect the 33KV/415 volts substation at the supply entrance while 415 Volts distribution network goes roud the premises.